Deliverable D1.3 aims to specify the Living Lab infrastructure requirements of the equipment to be provided for the three pilot sites, Hamburg, Luka Koper and Athens, respectively. Such infrastructure includes requirements for devices needed for the port operation, maintenance equipment, local traffic management systems, and telematics on-board-units as well as connected IoT items.